Removing the first set of forms after the "deep end" walls
have hardened.
|

Some of the plywood needed some convincing |
|
|
Digging the drain and building the
second set of forms. (Nov 12, 2000)
|

Ready for base material |

Detail on the french drain |

Drain located outside of deck area |

drain, for accidental overflow from leaking plumbing, about 3 ft deep. |

Chip digging the trench |
|

Chip digging out roots. |

Look at that ax action! |
 |
2 cubic yards of concrete base material moved from the street to the
foundation area. This allowed about 2 inches of base material throughout
the area. (Nov 19, 2000)
|

ready for more cement |

rebar in place - from east end |

rebar in place - from west end |

Drain area |

Inside the "deep end" |
|
Ready for concrete!