Backyard Remodeling Project

 [ Home ]

Removing the first set of forms after the "deep end" walls have hardened.

sledge.jpg (42796 bytes)
Some of the plywood needed some convincing
removeforms.jpg (63002 bytes)

Digging the drain and building the second set of forms. (Nov 12, 2000)

newforms.jpg (59629 bytes)
Ready for base material
drain6.jpg (72097 bytes)
Detail on the french drain
drain4.jpg (78135 bytes)
Drain located outside of deck area
drain5.jpg (51978 bytes)
drain, for accidental overflow from leaking plumbing, about 3 ft deep.
digging1.jpg (72269 bytes)
Chip digging the trench
digging2.jpg (69185 bytes)
drain1.jpg (677041 bytes)
Chip digging out roots.
drain2.jpg (84567 bytes)
Look at that ax action!
drain3.jpg (84152 bytes)

2 cubic yards of concrete base material moved from the street to the foundation area. This allowed about 2 inches of base material throughout the area. (Nov 19, 2000)

finalform.jpg (119838 bytes)
ready for more cement
finalform3.jpg (140750 bytes)
rebar in place - from east end
finalform2.jpg (123428 bytes)
rebar in place - from west end
finalform4.jpg (136782 bytes)
Drain area
finalform1.jpg (118495 bytes)
Inside the "deep end"

Ready for concrete!